Buy a Deck
Type the size you want. You get the boxes that size needs and the price, about $420 to $520 a square metre including GST.
4.45 × 3.49 metres
4 Bearers end to end × 3 frames side by side. 15.5 square metres. A deck is built in whole modules, so it takes the nearest size.
$6,786
Including GST ($6,169 plus GST). Delivery is added at checkout. Footings or ground screws are not included.
| 7 × Beam Box | $3,719 |
| 16 × Board Box | $1,390 |
| 12 × Hardware Box | $1,676 |
| Shipping weight | About 604 kilograms |
Buy These Boxes opens the Terraform store with these boxes in the cart. Plan Your Deck draws the deck on your own block first.
How Easy It Is
Every part arrives cut and pre-drilled. No cutting. Tools: a drill and driver bits, a hammer, a tape measure and a spirit level.
Step 2 of 12
Fit the Legs
2 Legs per Bearer, 247.5 millimetres in from each end. 1 screw each.
Step 4 of 12
Fit the MiddleBrackets
2 per Bearer, at the pre-drilled holes one third and two thirds along.
Step 7 of 12
Fit the Joists
Lower a Joist into every bracket and screw each end.
Step 11 of 12
Lay the Boards
Slide each row of Boards onto the Clips, then screw down the next Clips.
Any Size
A frame is 2 Bearer lines joined by Joists. Add Bearers end to end for length and frames side by side for width. Every deck is made to your size.
Length
Bearers end to end × 1,113.5 millimetres
Width
Frames side by side × 1,163.3 millimetres
Terraform App
Plan Your Deck on Your Phone
Install the Terraform App from terraform.au/app, with no app store. Plan a deck on your block plan in whole modules, see the boxes and the price, then buy them.
What Arrives
Your deck ships in 3 kinds of box, each under 25 kilograms and 1.2 metres long. Couriers deliver anywhere in Australia.
Beam Box
10 Bearers and Joists
1,160 × 245 × 130 millimetres. Up to 24.4 kilograms.
Board Box
6 Boards
1,160 × 300 × 80 millimetres. About 24.9 kilograms.
Hardware Box
Brackets, Legs, Clips and screws
1 box per module: 6 MiddleBrackets, 2 CornerOne, 2 CornerTwo, 4 Legs, 2 BearerDoublers, 56 Clips and 138 screws. 400 × 420 × 140 millimetres, about 4.5 kilograms.
Plan Your Deck counts the parts and boxes for your size.
Assembly Instructions
20 pages: safety, tools, sizes, the span table, every part and 12 steps.
Decks, Floors, Landings and Platforms
Decks
Outdoor Living
The Board top sits 101 millimetres above the Leg base, close to the level of your back door.
Floors
Level Floors
A level floor over a slab, garage, shed or studio, on footings an engineer designs or on ground screws.
Landings
Entries and Steps
1 frame is 1.11 × 1.16 metres. Ready the same day.
Platforms
Spas and Cabins
Rated to 4.0 kilopascals. A filled spa can exceed that, so have an engineer check the spa's loading first.
Test Results
| Test | Result |
|---|---|
| Four-point bend, peak load | 24.02 kilonewtons |
| Deck application, 4.0 kilopascal design live load | 1,800 kilograms over 2 square metres for 10 minutes |
| Fire, heat evolved index | 4 or less |
| Fire, spread of flame index | 5 or less |
| Slip resistance, oil-wet inclining platform | R10 |
| Termite attack | Not a food |
Designed to AS 1170 Structural Design Actions and AS 1664.1 Aluminium Structures, tested at an accredited laboratory. Full test certificates available on request.
Specification
| Material | Aluminium frame and Boards |
| Bearer and Joist section | 55 × 45 millimetres |
| Height, Leg base to Board top | 101 millimetres: Leg 25, Bearer 55, Board 21 |
| Length | Bearers end to end × 1,113.5 millimetres |
| Width | Frames side by side × 1,163.3 millimetres |
| Design live load | 4.0 kilopascals |
| Joist spacing | 371.2 millimetres (450 maximum) |
| Joist span | 1,118.3 millimetres (2,000 maximum) |
| Leg spacing | 618.5 millimetres, 495 across a joint (900 maximum) |
| Bearer end to nearest Leg | 247.5 millimetres |
| Parts | Bearer, Joist, MiddleBracket, CornerOne, CornerTwo, Leg, BearerDoubler, Board, Clip |
| Supports | Footings a civil engineer designs, or ground screws (not included) |
Safety
Read the Safety page before you build.
Warning
Risk of serious injury or death.
- Permits. Obtain every building permit and meet every council and building code requirement.
- Footings. A civil engineer designs and certifies the footings and the hold down. A light frame can lift in high wind.
- Underground services. Before you dig or drive ground screws, contact Before You Dig Australia at byda.com.au or 1100.
- Span table. Build within the span table. Never leave out a Leg, Joist or Clip.
- Load. Rated to 4.0 kilopascals. A filled spa, water tank or heavy planter can exceed it. Ask an engineer first.
- Modifications. Do not cut, drill or modify any part.
- Falls. Where a fall is 1 metre or more, fit a balustrade at least 1 metre high. Balustrades are not included.
- Pools. Keep deck edges and steps more than 500 millimetres from a pool barrier. Metal within reach of a pool may need bonding by a licensed electrician.
- Children. Small parts. Keep screws and Clips away from children.
- Surfaces. Boards are slippery when wet. Aluminium in full sun can burn bare feet.
Caution
Risk of damage to the deck.
- Steel. Keep the aluminium frame off steel unless the steel is galvanised or powder coated.
- Screws. Use the galvanised screws supplied.
- Salt water. Near salt water or a pool, use 316 stainless screws with isolating washers.
- Maintenance. Check every screw and Clip once a year. Replace any damaged part.
Permits and Approvals
The Board top of a Terraform Deck sits 101 millimetres above the Leg base, which in most states is well below the height at which a deck needs a building permit. Rules vary, and your local council has the final say. It is the installer's responsibility to meet local codes and obtain any permits.
| New South Wales | Planning Portal, exempt development |
| Victoria | Building and Plumbing Commission |
| Queensland | Queensland Building and Construction Commission, building approvals |
| South Australia | PlanSA, do you need approval |
| Western Australia | Building and Energy |
| Tasmania | Consumer, Building and Occupational Services, categories of work |
| Australian Capital Territory | Planning, do you need building approval |
| Northern Territory | Northern Territory Government, work that requires permits |
| National | National Construction Code |
Questions
How long does it take to build?
2 people build a small deck in an afternoon. Larger decks take longer, and every step repeats.
Do I need a builder?
You can build it yourself. Every part is cut and pre-drilled, and the assembly instructions show each step. A civil engineer designs the footings.
What tools do I need?
A drill and driver bits, a hammer, a tape measure and a spirit level. Every part arrives cut to size, so there is no cutting.
Will it hold an outdoor setting?
Yes. The frame is designed to a 4.0 kilopascal live load, roughly 400 kilograms per square metre. In test it held 1,800 kilograms over 2 square metres for 10 minutes. A filled spa can exceed the rating, so ask an engineer first.
What does it stand on?
Each Leg stands on a footing a civil engineer designs, or on a ground screw. Ground screws are not included.
Do I need a permit?
Usually not at this height, but it depends on your council, the location and what is around it. Start with the state links above and confirm with your council.
What sizes can I order?
Any size in whole modules. Plan Your Deck draws your deck on your block and counts every part and box.
Can it go against steel?
Yes, when the steel is galvanised or powder coated, since bare steel corrodes against aluminium. Every screw supplied is galvanised for that reason.
